Home
References
Contact
 

Windsor's very first tracker system is in operation at the RET-Center at 1680 Kildare in Windsor Ontario Canada, grid-connected since August 2010.



View of the RET-Center with multiple operating solar systems, both solar PV as well as solar thermal.


Installation examples 10 kW in Ontario, in 2010.


More 2010 installations in Ontario, above with "black line" modules.


Another installation in Ontario, in process.







Below show room example of mounts4solar systems, more at www.mounts4solar.com :


We host events at the RET-Center, such as the first Windsor electric vehicle gathering event this late summer 2010, see more at www.EV4solar.com:



EV event pictures, at the www.RET-Center.com.



More event pictures. This event was organized in cooperation with the University of Windsor. A total of nine electric vehicles participated, including some pure EVs.

Solar electric charging station below, our 5 kW solar car port, charging a hybrid vehicle while parked.




 
Top